Please note that the Engineers and Geoscientists BC office will be closed on Monday, April 29, 2024, as staff will be attending an all-day meeting. Regular business hours will resume on Tuesday, April 30.
Eligible for 1 CE Hour(s) of Informal Learning
Don't have an account with us? Create an account to register for this event.
This virtual tour of the Site C generating station will provide a 3D walkthrough of the entire facility, with a focus on the feedback received and design changes made to the facility as a result. The means and process used by BC Hydro to seek and incorporate feedback in a cost effective manner will be discussed.
Richard Whittaker is a professional electrical engineer with BC Hydro where he started as an EIT providing engineering support for generator inspection; testing and repair work for generating facilities. Richard is part of the Site C Project, working with the design team and BC Hydro’s equipment suppliers and construction contractors to bring a maintenance and operations perspective to the design and now, construction, of the Project.